Comparative risk assessment of exploitation of old and new thermal power plant's ash disposal sites in Kostolac, according to hydrological scenario
In this paper a comparative risk assessment of the exploitation of old and new ash disposal sites in Kostolac is given. Risk assessment is carried out according to the FMEA (Failure Modes and Effects Analysis) method in combination with a risk matrix, which includes a detailed elaboration of potential accident scenario at disposal sites and analysis of consequences that accident can cause. As a potential accident scenario only hydrological scenario is taken into consideration, which is based on the influx of large amounts of precipitation, the cause of the largest number of accidents at industrial disposal sites. Analyses of environmental consequences, potential human losses and economic consequences are given. According to the risk matrix it is found that both of disposal sites are in the 'blue' zone of risk, which is interpreted as a tolerable level of risk, although the new disposal site is still in a better position than the old one because the expected level of risk is lower by one degree.
Comparative risk assessment of exploitation of old and new thermal power plant's ash disposal sites in Kostolac, according to hydrological scenario
In this paper a comparative risk assessment of the exploitation of old and new ash disposal sites in Kostolac is given. Risk assessment is carried out according to the FMEA (Failure Modes and Effects Analysis) method in combination with a risk matrix, which includes a detailed elaboration of potential accident scenario at disposal sites and analysis of consequences that accident can cause. As a potential accident scenario only hydrological scenario is taken into consideration, which is based on the influx of large amounts of precipitation, the cause of the largest number of accidents at industrial disposal sites. Analyses of environmental consequences, potential human losses and economic consequences are given. According to the risk matrix it is found that both of disposal sites are in the 'blue' zone of risk, which is interpreted as a tolerable level of risk, although the new disposal site is still in a better position than the old one because the expected level of risk is lower by one degree.
Comparative risk assessment of exploitation of old and new thermal power plant's ash disposal sites in Kostolac, according to hydrological scenario
Nišić Dragana D. (Autor:in) / Knežević Dinko N. (Autor:in) / Sijerković Nevena Đ. (Autor:in) / Pantelić Uroš R. (Autor:in) / Banković Mirjana V. (Autor:in)
2016
Aufsatz (Zeitschrift)
Elektronische Ressource
Unbekannt
Metadata by DOAJ is licensed under CC BY-SA 1.0
Risk classification of 'Nikola Tesla - B' thermal power plant's ash disposal site
DOAJ | 2015
|Fort Worth sewage disposal plant's improvement
Engineering Index Backfile | 1929
|Management of environmental quality and Kostolac mine areas natural resources usage
Online Contents | 2014
|Impact of air stagging in furnace on processes in power steam boiler TPP Kostolac B
DOAJ | 2021
|Case Study - Metering utility plant's power
Online Contents | 2009