Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction of dams using the hydraulic fill method, discussion of the methodology of the Tailings Storage Facility Zelazny Most
The hydraulic fill method of erecting dams was characterized. The main assumptions and practical aspects of sand spigot were discussed on the example of the spigot of the dam body of the Zelazny Most Tailings Storage Facility (TSF). The advantages and disadvantages of the method are discussed, and the directions of attempts to implement pipelines rising along with sedimenting waste are presented, which are to reduce earthworks.
Construction of dams using the hydraulic fill method, discussion of the methodology of the Tailings Storage Facility Zelazny Most
The hydraulic fill method of erecting dams was characterized. The main assumptions and practical aspects of sand spigot were discussed on the example of the spigot of the dam body of the Zelazny Most Tailings Storage Facility (TSF). The advantages and disadvantages of the method are discussed, and the directions of attempts to implement pipelines rising along with sedimenting waste are presented, which are to reduce earthworks.
Construction of dams using the hydraulic fill method, discussion of the methodology of the Tailings Storage Facility Zelazny Most
Zbigniew Skrzypczak (Autor:in) / Adrian Różański (Autor:in) / Irena Bagińska (Autor:in) / Robert Pratkowiecki (Autor:in)
2022
Aufsatz (Zeitschrift)
Elektronische Ressource
Unbekannt
Metadata by DOAJ is licensed under CC BY-SA 1.0
British Library Online Contents | 2014
|British Library Online Contents | 2014
|Discussion on Hydraulic-Fill Dams
ASCE | 2021
|Discussion on Hydraulic-Fill Dams
ASCE | 2021
|