Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Risk Assessment System Based on Fuzzy Composite Evaluation and a Backpropagation Neural Network for a Shield Tunnel Crossing under a River
Constructing a shield tunnel that crosses under a river poses considerable safety risks, and risk assessment is essential for guaranteeing the safety of tunnel construction. This paper studies a risk assessment system for a shield tunnel crossing under a river. Risk identification is performed for the shield tunnel, and the risk factors and indicators are determined. The relationship between the two is determined preliminarily by numerical simulation, the numerical simulation results are verified by field measurements, and a sample set is established based on the numerical simulation results. Fuzzy comprehensive evaluation and a backpropagation neural network are then used to evaluate and analyze the risk level. Finally, the risk assessment system is used to evaluate the risk for Line 5 of the Hangzhou Metro in China. Based on the evaluation results, adjustments to the slurry strength, grouting pressure, and soil chamber pressure are proposed, and the risk is mitigated effectively.
Risk Assessment System Based on Fuzzy Composite Evaluation and a Backpropagation Neural Network for a Shield Tunnel Crossing under a River
Constructing a shield tunnel that crosses under a river poses considerable safety risks, and risk assessment is essential for guaranteeing the safety of tunnel construction. This paper studies a risk assessment system for a shield tunnel crossing under a river. Risk identification is performed for the shield tunnel, and the risk factors and indicators are determined. The relationship between the two is determined preliminarily by numerical simulation, the numerical simulation results are verified by field measurements, and a sample set is established based on the numerical simulation results. Fuzzy comprehensive evaluation and a backpropagation neural network are then used to evaluate and analyze the risk level. Finally, the risk assessment system is used to evaluate the risk for Line 5 of the Hangzhou Metro in China. Based on the evaluation results, adjustments to the slurry strength, grouting pressure, and soil chamber pressure are proposed, and the risk is mitigated effectively.
Risk Assessment System Based on Fuzzy Composite Evaluation and a Backpropagation Neural Network for a Shield Tunnel Crossing under a River
Xiao Liang (Autor:in) / Taiyue Qi (Autor:in) / Zhiyi Jin (Autor:in) / Shaojie Qin (Autor:in) / Pengtao Chen (Autor:in)
2020
Aufsatz (Zeitschrift)
Elektronische Ressource
Unbekannt
Metadata by DOAJ is licensed under CC BY-SA 1.0
Discussion and Analysis about Working Well of Tunnel Shield of Shanghai Tunnel Crossing River
British Library Conference Proceedings | 2013
|Discussion and Analysis about Working Well of Tunnel Shield of Shanghai Tunnel Crossing River
Trans Tech Publications | 2013
|Application of WSS in Mined Tunnel Crossing under the Existing Shield Tunnel
British Library Conference Proceedings | 2014
|The construction of shield tunnel crossing right under Shinkansen station
British Library Conference Proceedings | 2007
|