Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Design and construction of high-tension power line, 56 km long, connecting existing networks on both sides of Alps; voltage varies from 150 kv to 380 kv and max output may be 400,000 kw; details of steel-frame towers, insulators, etc; work completed in 5 mo.
Design and construction of high-tension power line, 56 km long, connecting existing networks on both sides of Alps; voltage varies from 150 kv to 380 kv and max output may be 400,000 kw; details of steel-frame towers, insulators, etc; work completed in 5 mo.
La ligne a haute tension de Gothard et sa construction
La ligne a haute tension de Gothard et sa construction
Niesz (Autor:in)
1936
31 pages
Aufsatz (Zeitschrift)
Französisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Ligne d'ensachage haute cadence
British Library Online Contents | 2001
|DOSSIER ENSACHAGE - Ligne d'ensachage haute cadence
Online Contents | 2001
|Strengthening bridges on the Gothard railway
Engineering Index Backfile | 1901
|Étude des effets d'une ligne à haute tension de 735 kV sur le positionnement GPS
Online Contents | 1997
|Ventilation of the St. Gothard tunnel
Engineering Index Backfile | 1899