Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction of new concrete section, 4 to 10 m in height, on top masonry of Oued Fergoug dam in Algeria, partly demolished by flood of 1927; new concrete section is anchored in old masonry by means of cables lowered in special wells and sealed to old masonry. (Coyne method)
Construction of new concrete section, 4 to 10 m in height, on top masonry of Oued Fergoug dam in Algeria, partly demolished by flood of 1927; new concrete section is anchored in old masonry by means of cables lowered in special wells and sealed to old masonry. (Coyne method)
Note sur la fermeture partielle de la breche du barrage de l' oued fergoug
Note sur la fermeture partielle de la breche du barrage de l' oued fergoug
Drouhin (Autor:in)
1935
7 pages
Aufsatz (Zeitschrift)
Französisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Traitement du coursier de l'evacuateur de crue du barrage Oued Mellah
British Library Conference Proceedings | 1994
|Barrage Oued El Makhazine - Problemes d'erosion interne lies a la conduite sous remblai
British Library Conference Proceedings | 1997
|DataCite | 1905
Obturation de la breche vaudoise du Rhone
Engineering Index Backfile | 1935
Observation et prédiction d'une brèche de rupture dans une digue submergée
Online Contents | 2002
|