Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Levee banks paved with asphaltic concrete to stop erosion
Levee, near Montrose, Calif, paved for length of 1600 ft; levee was trimmed to 2:1 slope and protective coating made 5 in. thick, reinforced with wire mesh fastened to 2-in. pipe anchors driven down into fill.
Levee banks paved with asphaltic concrete to stop erosion
Levee, near Montrose, Calif, paved for length of 1600 ft; levee was trimmed to 2:1 slope and protective coating made 5 in. thick, reinforced with wire mesh fastened to 2-in. pipe anchors driven down into fill.
Levee banks paved with asphaltic concrete to stop erosion
Construction Methods
1942
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Flood channel paved with asphaltic concrete
Engineering Index Backfile | 1956
|TIBKAT | 1962
|Engineering Index Backfile | 1920
|Engineering Index Backfile | 1922
|Levee Erosion Screening Process
British Library Conference Proceedings | 2011
|