Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Photographic analysis for construction operations
Problems of applying methods-study techniques in construction operations such as stop-watch time studies, micromotion studies, and data analysis by process and multiple-activity charts; new memomotion studies replace high speeds of micromotion method with extremely low speeds; film record enables analysis and graphic representation of simultaneous activities of crew of men or of men and machines on multiple-activity chart.
Photographic analysis for construction operations
Problems of applying methods-study techniques in construction operations such as stop-watch time studies, micromotion studies, and data analysis by process and multiple-activity charts; new memomotion studies replace high speeds of micromotion method with extremely low speeds; film record enables analysis and graphic representation of simultaneous activities of crew of men or of men and machines on multiple-activity chart.
Photographic analysis for construction operations
ASCE -- Proc (J Construction Div)
Fondahl, J.W. (Autor:in)
1960
17 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Photographic Analysis for Construction Operations
ASCE | 2021
|Construction and adjustment of photographic apparatus
Engineering Index Backfile | 1925
|Photographic Feature: - Tha Dan Dam under Construction in Thailand
Online Contents | 2001
|