Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Viaduct piers built with plywood forms and vibrated concrete
Construction of 33 concrete piers for viaduct section of Route 21, at Newark, N J, using system of form clamps and ties which facilitated rapid stripping and re-use of plywood panels and method of internal concrete vibration, employing air-driven vibrator.
Viaduct piers built with plywood forms and vibrated concrete
Construction of 33 concrete piers for viaduct section of Route 21, at Newark, N J, using system of form clamps and ties which facilitated rapid stripping and re-use of plywood panels and method of internal concrete vibration, employing air-driven vibrator.
Viaduct piers built with plywood forms and vibrated concrete
Construction Methods
Construction Methods ; 16
1934
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1965
|Susquehanna concrete viaduct built in halves
Engineering Index Backfile | 1916
Second Severn crossing - viaduct superstructure and piers
British Library Online Contents | 1997
|Long concrete-arch viaduct built near Cleveland
Engineering Index Backfile | 1934
|Construction method for spliced viaduct with prefabricated piers
Europäisches Patentamt | 2020
|