Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Improvements on Chester-holyhead road
Brief illustrated description of viaduct, consisting of seven 80-ft spans; piers are 90 ft high and designed for total theoretical loading of over 5000 tons; built of concrete faced with Penmaenmawr stone; road is carried on reinforced-concrete deck surfaced with tar macadam.
Improvements on Chester-holyhead road
Brief illustrated description of viaduct, consisting of seven 80-ft spans; piers are 90 ft high and designed for total theoretical loading of over 5000 tons; built of concrete faced with Penmaenmawr stone; road is carried on reinforced-concrete deck surfaced with tar macadam.
Improvements on Chester-holyhead road
Engineering
Engineering ; 140
1935
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Reconstruction of Chester -- Holyhead road near penmaenmawr, north Wales
Engineering Index Backfile | 1937
|Reconstruction of Chester -- Holyhead road near penmaenmawr, north Wales
Engineering Index Backfile | 1937
|TELFORD'S HOLYHEAD ROAD-THE FIRST SUPER HIGHWAY
British Library Online Contents | 2007
|General description of the Britannia and Conway tubular bridges : on the Chester & Holyhead Railway
UB Braunschweig | 1849
|