Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Design of complete sewerage system for municipality
Features which had to be considered in design of North Toronto system; combined vs separate sewers; location of sewer outlet; computing run-off; estimating rate of flow; calculating size of sewer; repair of sewers; minimum size. Before Can Inst on Sewage and Sanitation. (See also Can Engr v 67 n 19 Nov 6 1934 p 19-26)
Design of complete sewerage system for municipality
Features which had to be considered in design of North Toronto system; combined vs separate sewers; location of sewer outlet; computing run-off; estimating rate of flow; calculating size of sewer; repair of sewers; minimum size. Before Can Inst on Sewage and Sanitation. (See also Can Engr v 67 n 19 Nov 6 1934 p 19-26)
Design of complete sewerage system for municipality
Eng Contract Rec
Phelps, G. (Autor:in)
1934
8 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Design of complete sewerage system for municipality
Engineering Index Backfile | 1934
|DESIGN METHOD OF SEWERAGE PIPELINE NETWORK AND DESIGN SYSTEM OF SEWERAGE PIPELINE NETWORK
Europäisches Patentamt | 2018
|Sewerage and sewerage treatment
Engineering Index Backfile | 1953
|