Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
New Indiana pavement construction has asphalt center strip with concrete sides
20-ft strip of asphalt with 10 ft of concrete on each side is design adopted for pavement of Ridge Road for distance of 3.83 mi westward from Gary, Ind; asphalt base course; asphalt top course.
New Indiana pavement construction has asphalt center strip with concrete sides
20-ft strip of asphalt with 10 ft of concrete on each side is design adopted for pavement of Ridge Road for distance of 3.83 mi westward from Gary, Ind; asphalt base course; asphalt top course.
New Indiana pavement construction has asphalt center strip with concrete sides
Roads Streets
Roads and Streets ; 77
1934
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Asphalt concrete and asphalt concrete pavement construction method
Europäisches Patentamt | 2022
|