Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Missouri Pacific completes filling of 53 trestles
During last 18 yr, 4.5 mi of frame trestles in Ozark mountains have been replaced by embankments involving placing of 4,338,000 cu yd of filling material.
Missouri Pacific completes filling of 53 trestles
During last 18 yr, 4.5 mi of frame trestles in Ozark mountains have been replaced by embankments involving placing of 4,338,000 cu yd of filling material.
Missouri Pacific completes filling of 53 trestles
Ry Age
Railway Age ; 99
1935
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Embankment filling without trestles
Engineering Index Backfile | 1920
Replacing trestles with earthwork
Engineering Index Backfile | 1895
Engineering Index Backfile | 1934