Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Major improvement works of port of London authority, 1925-1930
Description of new improvements costing about 4,550,000 pounds including Tilbury, West India and Millwall docks improvements; construction of passenger landing docks, shore works, bridges, dolphins, booms, and moorings, and also entrance lock and shed and quay equipment; cost data. (see also Engineering v 139 n 3609 Mar 15 1935 p 296)
Major improvement works of port of London authority, 1925-1930
Description of new improvements costing about 4,550,000 pounds including Tilbury, West India and Millwall docks improvements; construction of passenger landing docks, shore works, bridges, dolphins, booms, and moorings, and also entrance lock and shed and quay equipment; cost data. (see also Engineering v 139 n 3609 Mar 15 1935 p 296)
Major improvement works of port of London authority, 1925-1930
Instn Civ Engrs -- Min Proc
Davis, F.W.D. (Autor:in) / Mackenzie, W. (Autor:in)
1935
64 pages
1 Supp Sheet
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
London. Improvements at Royal Docks, Port of London Authority
Engineering Index Backfile | 1939
|KONSTANTIN MEL'NIKOV: 1925-1930
British Library Online Contents | 2014
|London. Improvements at Royal Docks, Port of London Authority
Engineering Index Backfile | 1939
|Reclamation unit for port of London authority
Engineering Index Backfile | 1963
Vier Siedlungen in Duisburg : 1925 - 1930
TIBKAT | 1975
|