Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Remedial measures on arapuni hydro-electric scheme of power development on waikato river, New Zealand
Methods used in overcoming special difficulties encountered in construction of large hydroelectric power plants; concreting of falls, lining of headrace, grouting and dowelling, and installation of second gate in diversion-tunnel; grouting headrace under water.
Remedial measures on arapuni hydro-electric scheme of power development on waikato river, New Zealand
Methods used in overcoming special difficulties encountered in construction of large hydroelectric power plants; concreting of falls, lining of headrace, grouting and dowelling, and installation of second gate in diversion-tunnel; grouting headrace under water.
Remedial measures on arapuni hydro-electric scheme of power development on waikato river, New Zealand
Instn Civ Engrs -- Min Proc
Furkert, F.W. (Autor:in)
1935
47 pages
1 Supp plate
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Arapuni (New Zealand) hydro-electric power development
Engineering Index Backfile | 1929
|Engineering Index Backfile | 1929
|River Shannon hydro-electric scheme: Fort Henry embankment, upstream slope failure and remedial work
British Library Conference Proceedings | 2002
|Arch bridge strengthening - Tainui Bridge over the Waikato River, New Zealand
British Library Conference Proceedings | 2006
|Water quality monitoring in the Waikato River, North Island, New Zealand
British Library Conference Proceedings | 1994
|