Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Earthfill Dam to be built by method of soil-compaction control
Features of Cajalco Dam, near Riverside, Calif, 240 ft ultimate height, now in course of construction; cost estimated at about $5,000,000.
Earthfill Dam to be built by method of soil-compaction control
Features of Cajalco Dam, near Riverside, Calif, 240 ft ultimate height, now in course of construction; cost estimated at about $5,000,000.
Earthfill Dam to be built by method of soil-compaction control
Eng News-Rec
Engineering News-Record ; 115
1935
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Concrete gravity dam built like earthfill
Engineering Index Backfile | 1964
Impervious core compaction using heavy vibrating rollers (earthfill dam)
Tema Archiv | 1979
|Compaction of earthfill in the Nurek dam and organization of geotechnical control
Online Contents | 1979
|Compaction of earthfill in the Nurek dam and organization of geotechnical control
Springer Verlag | 1979
|Engineering Index Backfile | 1943
|