Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Three cableways of 1,510-ft. span Place 250,000 yd. of concrete in Montgomery Island locks
Description of equipment and methods used in concrete placing; general construction plan; cofferdam; excavation; caissons; cableways; mixing plant; concrete; night lighting; floods; progress; administration.
Three cableways of 1,510-ft. span Place 250,000 yd. of concrete in Montgomery Island locks
Description of equipment and methods used in concrete placing; general construction plan; cofferdam; excavation; caissons; cableways; mixing plant; concrete; night lighting; floods; progress; administration.
Three cableways of 1,510-ft. span Place 250,000 yd. of concrete in Montgomery Island locks
Construction Methods
Construction Methods ; 16
1934
5 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Three long-span cableways place concrete on Ohio river locks
Engineering Index Backfile | 1934
Concrete in Montgomery Island locks
Engineering Index Backfile | 1935
|Twin cableways of long span place concrete at norris dam
Engineering Index Backfile | 1934
Cableways place hoover dam concrete
Engineering Index Backfile | 1933
|Cableways place concrete in Boulder Dam
Engineering Index Backfile | 1934