Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
G tees (Newport) bridge, middlesbrough
Design and construction of 11-span steel truss bridge, 4920 ft long, including lift span 265 ft long with vertical clearance of 120 ft; details of pier foundations; electrical and mechanical equipment of lift spans; total cost £426,841.
G tees (Newport) bridge, middlesbrough
Design and construction of 11-span steel truss bridge, 4920 ft long, including lift span 265 ft long with vertical clearance of 120 ft; details of pier foundations; electrical and mechanical equipment of lift spans; total cost £426,841.
G tees (Newport) bridge, middlesbrough
Instn Civ Engrs -- Min Proc
Hamilton, J.A.K. (Autor:in) / Graves, J.T. (Autor:in)
1935
34 pages
1 Supp plate
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Vertical-lift bridge over Tees at Middlesbrough
Engineering Index Backfile | 1934
Vertical-lift bridge over Tees at Middlesbrough
Engineering Index Backfile | 1934
Engineering Index Backfile | 1932
British Library Online Contents | 1997
|