Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Strengthening of two wooden pile foundations of concrete piers of railroad bridge over Humboldt Station in Berlin, Germany, by adding new concrete piles, chemical consolidation of ground and increasing cross-section of concrete piers.
Strengthening of two wooden pile foundations of concrete piers of railroad bridge over Humboldt Station in Berlin, Germany, by adding new concrete piles, chemical consolidation of ground and increasing cross-section of concrete piers.
Pfeilerverstaerkung mit nachtraeglicher Tiefgruendung
Pfeilerverstaerkung mit nachtraeglicher Tiefgruendung
Mast, O. (Autor:in)
Bauingenieur ; 15
1934
5 pages
Aufsatz (Zeitschrift)
Deutsch
© Metadata Copyright Elsevier B. V. All rights reserved.
Nachtraeglicher Betonbodenausgleich in einem Hochregallager
British Library Online Contents | 1993
|British Library Online Contents | 1999