Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Design and construction of spillways having total capacity of 400,000 cu ft per sec, including inclined tunnel spillways with drop of about 570 ft; concrete lining of channels; installation of drum gates.
Design and construction of spillways having total capacity of 400,000 cu ft per sec, including inclined tunnel spillways with drop of about 570 ft; concrete lining of channels; installation of drum gates.
Boulder dam spillways
Reclamation Era
Nelson, W.R. (Autor:in)
Reclamation Era ; 25
1935
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Hydraulic-model tests for Boulder dam spillways
Engineering Index Backfile | 1933
|Automatic sector sluice spillways at Boulder dam
Engineering Index Backfile | 1937
|Analysis of Boulder Dam spillways made by Swiss Laboratory
Engineering Index Backfile | 1934
|Drum gates and drum gate control mechanisms for spillways at Boulder dam
Engineering Index Backfile | 1933
SPILLWAYS: Residual energy in stepped spillways
Online Contents | 1994