Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Erecting penstock pipe sections at Boulder dam
Description of unusual equipment and new methods developed for transporting and jointing 30-ft diam units; record size trailer of 200-ton capacity; unique type of cold-pinned connection used on girth joints of large sections of pipe; connections to main headers; painting and testing.
Erecting penstock pipe sections at Boulder dam
Description of unusual equipment and new methods developed for transporting and jointing 30-ft diam units; record size trailer of 200-ton capacity; unique type of cold-pinned connection used on girth joints of large sections of pipe; connections to main headers; painting and testing.
Erecting penstock pipe sections at Boulder dam
Western Construction News
Nelson, W.R. (Autor:in)
1935
5 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Hydropower - Optimal penstock routing with curved pipe
Online Contents | 2013
Madison Penstock Rehabilitation
British Library Conference Proceedings | 1997
|Engineering Index Backfile | 1941
|Cleuson Dixence Penstock Tunnel
British Library Conference Proceedings | 2000
|Engineering Index Backfile | 1944
|