Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Progress on Boulder dam
n 4126 Feb 8 1935 p 154-155: Special low-heat cement specified for greater part of dam; system of cooling of concrete employed for dissipation of heat of hydration. n 4127 Feb 15 p 170-172: Forms and casting method. n 4128 Feb 22 p 196-7: Cooling operations. n 4129 Mar 1 p 222-223 + 226: Intake towers and spillways; power house and penstocks. (See also - n 4126 p 222-3 and 226) (See also - editorial comment p 227)
Progress on Boulder dam
n 4126 Feb 8 1935 p 154-155: Special low-heat cement specified for greater part of dam; system of cooling of concrete employed for dissipation of heat of hydration. n 4127 Feb 15 p 170-172: Forms and casting method. n 4128 Feb 22 p 196-7: Cooling operations. n 4129 Mar 1 p 222-223 + 226: Intake towers and spillways; power house and penstocks. (See also - n 4126 p 222-3 and 226) (See also - editorial comment p 227)
Progress on Boulder dam
Engineer
Engineer ; 159
1935
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Progress of construction at Boulder dam
Engineering Index Backfile | 1935
|Engineering Index Backfile | 1941
Engineering Index Backfile | 1937
|Engineering Index Backfile | 1937
|Engineering Index Backfile | 1938
|