Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Blasting delays in tunnel construction
Discussion of J. L. BURKHOLDER'S paper forming part of symposium entitled "Colorado River Aqueduct Makes. Rapid Progress", indexed from issue of Feb 1935.
Blasting delays in tunnel construction
Discussion of J. L. BURKHOLDER'S paper forming part of symposium entitled "Colorado River Aqueduct Makes. Rapid Progress", indexed from issue of Feb 1935.
Blasting delays in tunnel construction
Civ Eng (NY)
Hoffmark, R.F. (Autor:in)
1935
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Smooth Blasting Construction Technology of Urban Shallow Subway Tunnel
Trans Tech Publications | 2015
|Engineering Index Backfile | 1930
|Reservoir area diversion tunnel inlet rock plug blasting construction method
Europäisches Patentamt | 2024
|Vibration vulnerability of shotcrete on tunnel walls during construction blasting
British Library Online Contents | 2014
|Vibration vulnerability of shotcrete on tunnel walls during construction blasting
Online Contents | 2014
|