Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Metro Toronto chooses soil cement sub-base
Reasons for use of 5-in. soil-cement sub-base in 7 1/2-mi, 6-lane Spadina Expressway in Toronto include preventing of consolidation under load, pumping of sub-base, and infiltration of sub-grade material into sub-base, resisting frost action, providing uniform and stable support for final concrete pavement, and reducing loss in time during construction in wet weather.
Metro Toronto chooses soil cement sub-base
Reasons for use of 5-in. soil-cement sub-base in 7 1/2-mi, 6-lane Spadina Expressway in Toronto include preventing of consolidation under load, pumping of sub-base, and infiltration of sub-grade material into sub-base, resisting frost action, providing uniform and stable support for final concrete pavement, and reducing loss in time during construction in wet weather.
Metro Toronto chooses soil cement sub-base
Can Mun Utilities
1963
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Soil cement "first" for metro Toronto on Spadina expressway project
Engineering Index Backfile | 1963
|Madrid chooses CBTC for two metro line
IuD Bahn | 2005
Metro Toronto Convention Centre Expansion, Toronto
Online Contents | 1997
|Engineering Index Backfile | 1957
|Metro Toronto Convention Centre Expansion Toronto by Bregman and Hamann
British Library Online Contents | 1997
|