Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Seepage from irrigation channels can be reduced, bank stability improved, and groundwater movement controlled by installation of vertical plastic-membrane cutoffs in or adjacent to channel bank; design considerations and construction methods used on installations on Columbia Basin Project, including use of shield on ladder-type excavator in unstable ground are presented.
Seepage from irrigation channels can be reduced, bank stability improved, and groundwater movement controlled by installation of vertical plastic-membrane cutoffs in or adjacent to channel bank; design considerations and construction methods used on installations on Columbia Basin Project, including use of shield on ladder-type excavator in unstable ground are presented.
Plastic surgery on irrigation areas
ASCE -- Proc (J Construction Div)
Ehrman, K.S. (Autor:in)
1964
11 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Plastic Surgery on Irrigation Arteries
ASCE | 2021
|Irrigation projects for arid areas
Engineering Index Backfile | 1961
|Online Contents | 1995
Online Contents | 1994
Future of Irrigation in Humid Areas
Wiley | 1956
|