Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Who pays for unexpected in construction
Report of Committee on Contract Administration of Construction Division; contractual clause is suggested covering unexpected subsurface conditions, i.e. unknown or latent physical conditions of unusual nature at construction site, differing from those indicated in contract and from those generally recognized as inherent in work of same character.
Who pays for unexpected in construction
Report of Committee on Contract Administration of Construction Division; contractual clause is suggested covering unexpected subsurface conditions, i.e. unknown or latent physical conditions of unusual nature at construction site, differing from those indicated in contract and from those generally recognized as inherent in work of same character.
Who pays for unexpected in construction
ASCE -- Proc (J Construction Div)
1963
36 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
UB Braunschweig | 1974