Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Industrial water-power utilization in Oberhasli, Switzerland
Notes on Aar River project; Handek central will have average of 210, 000,000 cu. m. annually with net fall 504.4 mi.; Boden central 232, 000,000 cu. m. with 408 m. fall; Innertkirchen central, 255,000,000 cu. m. with 241 m. fall; only Handek, upper station, now being built with Grimsel and Gelmer dams; details of dam construction.
Industrial water-power utilization in Oberhasli, Switzerland
Notes on Aar River project; Handek central will have average of 210, 000,000 cu. m. annually with net fall 504.4 mi.; Boden central 232, 000,000 cu. m. with 408 m. fall; Innertkirchen central, 255,000,000 cu. m. with 241 m. fall; only Handek, upper station, now being built with Grimsel and Gelmer dams; details of dam construction.
Industrial water-power utilization in Oberhasli, Switzerland
Aprovechamientos hidraulicos industriales en el Oberhasli (Suiza)
Herran, T. (Autor:in)
1928
7 pages
11 Figs.
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
The oberhasli hydro-electric scheme
Engineering Index Backfile | 1930
|Constructional details of the oberhasli hydroelectric works
Engineering Index Backfile | 1921
Einfach spektakulär - Bürogebäude auf einem Werkhof in Oberhasli
Online Contents | 2012
|50-kv. high-tension lines Guttanen-Innertkirchen of Oberhasli Power Co.
Engineering Index Backfile | 1931
|