Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Hongrin-Lake Leman hydroelectric pumped storage development
Works include two thin concrete arch-gravity dams, 90 m and 125 m high, respectively, 8 km long 4 m diam pressure tunnel, and 1200 m long 2. 9 m diam penstock with 78% slope; equipment consists of four 60 Mw turbine-pump sets operating under 878 m head; mean annual output is 203 Gwh; pumps use 750 Gwh, with restitution of 535 Gwh; description of water diversion system, dam concreting by means of cable cranes, and work schedule.
Hongrin-Lake Leman hydroelectric pumped storage development
Works include two thin concrete arch-gravity dams, 90 m and 125 m high, respectively, 8 km long 4 m diam pressure tunnel, and 1200 m long 2. 9 m diam penstock with 78% slope; equipment consists of four 60 Mw turbine-pump sets operating under 878 m head; mean annual output is 203 Gwh; pumps use 750 Gwh, with restitution of 535 Gwh; description of water diversion system, dam concreting by means of cable cranes, and work schedule.
Hongrin-Lake Leman hydroelectric pumped storage development
Amenagement hydroelectrique Hongrin-Leman -- Un amenagement de turbinage-pompage
Lambert, R.H. (Autor:in)
1968
6 pages
Aufsatz (Zeitschrift)
Französisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Hongrin-Lake Leman hydroelectric development; description of some model tests
Engineering Index Backfile | 1968
|Hydroelectric and pumped storage plants
TIBKAT | 1989
|PUMPED STORAGE TURBINE HYDROELECTRIC GENERATING SYSTEM
Europäisches Patentamt | 2018
|The hongrin-leman development - part two
Tema Archiv | 1970
The Eagle Mountain Pumped Storage Hydroelectric Project
British Library Conference Proceedings | 1993
|