Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction surveys for merced river project
Design and construction control surveys for multipurpose hydroelectric facility near Merced, Calif, described, include primary project control, checking of aerial mapping, ground controls and initial layout surveys for all construction, checks of survey control in tunnel, surveys for land acquisition and development of information for project maps, precise surveys for equipment erection and compilation of as-built data.
Construction surveys for merced river project
Design and construction control surveys for multipurpose hydroelectric facility near Merced, Calif, described, include primary project control, checking of aerial mapping, ground controls and initial layout surveys for all construction, checks of survey control in tunnel, surveys for land acquisition and development of information for project maps, precise surveys for equipment erection and compilation of as-built data.
Construction surveys for merced river project
ASCE -- Proc (J Surveying Mapping Div)
Reitter, A.R. (Autor:in) / Janopaul, R.N. (Autor:in)
1968
8 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
New merced falls hydroelectric plant on Merced river
Engineering Index Backfile | 1932
|The exchequer project of the merced irrigation district
Engineering Index Backfile | 1926
|Online Contents | 1975
|The merced irrigation district
Engineering Index Backfile | 1926
|Grouting cracks restores 30-year-old dam on merced river
Engineering Index Backfile | 1931
|