Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Subway line goes to sea
Construction of $25 million double track connecting link as direct access by rail via overwater route of New York City's subway system through Brooklyn and Manhattan and on to Upper Bronx consists of 6 1/2 mi combination of precast concrete trestle, steel girders and two swing bridges; span over North Channel bridge has total length of 305 ft, over Beach Channel 325 ft; construction details.
Subway line goes to sea
Construction of $25 million double track connecting link as direct access by rail via overwater route of New York City's subway system through Brooklyn and Manhattan and on to Upper Bronx consists of 6 1/2 mi combination of precast concrete trestle, steel girders and two swing bridges; span over North Channel bridge has total length of 305 ft, over Beach Channel 325 ft; construction details.
Subway line goes to sea
Eng News-Rec
Engineering News-Record ; 155
1955
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Rome subway, line "B" Termini-Laurentina
British Library Online Contents | 1995
|Online Contents | 1996
British Library Online Contents | 1996
Risk identification and assessment in subway projects: case study of Nanjing Subway Line 2
Taylor & Francis Verlag | 2010
|Building construction method for crossing subway line
Europäisches Patentamt | 2022
|