Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Vertical auger rigs developed for hole excavation on Romona Freeway job east of Los Angeles at El Monte, where 3.96-mi section is under construction; 15 1/2-in. diam auger bits, driven by Eimco air motors used on Bucyrus-Erie and Northwest cranes to construct cast-in-place concrete piles.
Vertical auger rigs developed for hole excavation on Romona Freeway job east of Los Angeles at El Monte, where 3.96-mi section is under construction; 15 1/2-in. diam auger bits, driven by Eimco air motors used on Bucyrus-Erie and Northwest cranes to construct cast-in-place concrete piles.
Kiewit solves freeway problems
Excavating Engr
Day, R. (Autor:in)
Excavating Engineer ; 49
1955
2 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Online Contents | 2015
Equipment Report: Kiewit tests first Cedarapids HighWeigh portable plant
British Library Online Contents | 1997
Parallel processing solves FEA problems
British Library Online Contents | 1999
Insulating concrete solves conduit problems
Engineering Index Backfile | 1951
New luminaire solves hillside problems
Engineering Index Backfile | 1964