Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Sanitary fill practice in Los Angeles county
Cut and cover method of rubbish disposal is antithesis of socalled "open dump"; excavations are made to specified depths and at specific locations; excavated material is stock piled convenient to dumping operations and mixed with rubbish at rate of about 1 cu yd of earth to 4 cu yd of rubbish; rubbish is compacted by heavy bulldozer equipment not lighter than 21 tons.
Sanitary fill practice in Los Angeles county
Cut and cover method of rubbish disposal is antithesis of socalled "open dump"; excavations are made to specified depths and at specific locations; excavated material is stock piled convenient to dumping operations and mixed with rubbish at rate of about 1 cu yd of earth to 4 cu yd of rubbish; rubbish is compacted by heavy bulldozer equipment not lighter than 21 tons.
Sanitary fill practice in Los Angeles county
Am Soc Civ Engrs -- Proc Separate
Partin, J.L. (Autor:in)
1955
6 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Operating sanitary fill at Fresno, Calif.
Engineering Index Backfile | 1940
|Road maintenance plan and practice on Los Angeles County system
Engineering Index Backfile | 1939
Los Angeles County Airport plan
Engineering Index Backfile | 1931
|Los Angeles County Census 2000
British Library Conference Proceedings | 1996
|