Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Minneapolis: major river port to be
Proposed work of locks and dam will be principally dredging and bridge alterations; design of upper harbor was prepared by topographical survey; data on heavy equipment used; 3300 tons of piling have gone into cofferdams and 1000 tons into guide walls; channel dredging up to now amounts to 1,400,000 cu yd; lower lock and dam required 104,000 cu yd excavation; upper lock 183,000 cu yd.
Minneapolis: major river port to be
Proposed work of locks and dam will be principally dredging and bridge alterations; design of upper harbor was prepared by topographical survey; data on heavy equipment used; 3300 tons of piling have gone into cofferdams and 1000 tons into guide walls; channel dredging up to now amounts to 1,400,000 cu yd; lower lock and dam required 104,000 cu yd excavation; upper lock 183,000 cu yd.
Minneapolis: major river port to be
Excavating Engr
Excavating Engineer ; 48
1954
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
New Mississippi port for Minneapolis
Engineering Index Backfile | 1951
Minneapolis Pathways Minneapolis, Minnesota
British Library Online Contents | 1994
Rail-and-river terminal built at Minneapolis
Engineering Index Backfile | 1928
Mississippi river high dam at St. Paul and Minneapolis
Engineering Index Backfile | 1913
|PLANNING - Above the Falls . Minneapolis redefines its working river
Online Contents | 2001
|