Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Satisfactory service noted; construction of poles which are tapered tubes built up of individual 'members' linked together by "cross girder joint "; advantages of using aluminum.
Satisfactory service noted; construction of poles which are tapered tubes built up of individual 'members' linked together by "cross girder joint "; advantages of using aluminum.
10/50 kV overhead transmission line with aluminum poles erected in 1951/52 in canton of graubuenden, Switzerland
Eine 10/50-KV-Freileitung mit Aluminiummasten
Diem, K. (Autor:in)
Aluminium ; 31
1955
6 pages
Aufsatz (Zeitschrift)
Deutsch
© Metadata Copyright Elsevier B. V. All rights reserved.
British Library Online Contents | 1998
|Forest fires in Ticino Canton, Switzerland
British Library Conference Proceedings | 1995
|Bridge erected by combination of gin poles and derricks
Engineering Index Backfile | 1932
|Engineering Index Backfile | 1930
Digitalize Building Permits Procedure: Canton of Valais, Switzerland
British Library Conference Proceedings | 2015
|