Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Underground mill excavation at big Missouri mine
Mine on Upper Salmon river; snowfall 60 ft from Oct to Apr; underground rock conditions; mill layout; pilot tunnel 777 ft long, used later as tailing outlet; roof arch design modified to suit nature of rock; largest chambers 178 ft long, 37.5 wide and max height 40 ft, and 140 ft long, 64 ft wide and max height 55 ft. (See also - Bul n 315 July 1938)
Underground mill excavation at big Missouri mine
Mine on Upper Salmon river; snowfall 60 ft from Oct to Apr; underground rock conditions; mill layout; pilot tunnel 777 ft long, used later as tailing outlet; roof arch design modified to suit nature of rock; largest chambers 178 ft long, 37.5 wide and max height 40 ft, and 140 ft long, 64 ft wide and max height 55 ft. (See also - Bul n 315 July 1938)
Underground mill excavation at big Missouri mine
Can Inst Min Met -- Trans
Campbell, D.S. (Autor:in)
Canadian Institute of Mining and Metallurgy -- Meeting ; 1938
1938
11 pages
Aufsatz (Konferenz)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Underground mill excavation at big Missouri mine
Engineering Index Backfile | 1938
|Small excavation crusher for underground roadway of coal mine
Europäisches Patentamt | 2020
|Underground and deep excavation
British Library Conference Proceedings | 2006
|