Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Sewer construction affects tracks on three levels
Complications involved in underpinning viaduct at Detroit, main feature of which was driving 1200 steel piles to depths of 90 ft or more.
Sewer construction affects tracks on three levels
Complications involved in underpinning viaduct at Detroit, main feature of which was driving 1200 steel piles to depths of 90 ft or more.
Sewer construction affects tracks on three levels
Ry Age
Railway Age ; 104
1938
4 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1927
|Engineering Index Backfile | 1914
|Engineering Index Backfile | 1950
|Stabilization in sewer construction
Engineering Index Backfile | 1947
|Experience in sewer construction
Engineering Index Backfile | 1899
|