Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Description of 1/32 model, costing $1000, of 50,000 sec-ft "morning glory" spillway under construction for Keystone Dam in Nebraska; "morning glory" is 318-ft overflow weir turned into circle 101 ft in diam at crest and warped down into 28 1/2 ft tube, which turns through 90° at ground line into 800-ft outlet tube passing under dam.
Description of 1/32 model, costing $1000, of 50,000 sec-ft "morning glory" spillway under construction for Keystone Dam in Nebraska; "morning glory" is 318-ft overflow weir turned into circle 101 ft in diam at crest and warped down into 28 1/2 ft tube, which turns through 90° at ground line into 800-ft outlet tube passing under dam.
Keystone Dam spillway model
Eng News-Rec
Buzzell, D.A. (Autor:in)
Engineering News-Record ; 120
1938
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Spillway, stilling basin, and flood-control conduits: Keystone dam, Arkansas river
Engineering Index Backfile | 1960
|Spillway Modifications. San Esteban Spillway
British Library Conference Proceedings | 1992
|Spillway Debris Physical Model Study: Morning-glory Spillway Structure
British Library Conference Proceedings | 2020
|Model Study of Stepped Spillway in Supercritical Spillway Chute
British Library Conference Proceedings | 2008
|Spillway Gate Forces-Montgomery Point Spillway
British Library Conference Proceedings | 1995
|