Description of special works designed to remove some 50,000 tons of silt per day from Colorado River water entering All-American Canal, including settling basins covering almost 30 acres, and 72 rotary scrapers each 125 ft in diam; economic necessity of providing for silt removal; controlling scraper mechanisms; construction methods; rock-picking machine. (See also Reclamation Era v 28 n 8 Aug 1938 p 152-6)
Description of special works designed to remove some 50,000 tons of silt per day from Colorado River water entering All-American Canal, including settling basins covering almost 30 acres, and 72 rotary scrapers each 125 ft in diam; economic necessity of providing for silt removal; controlling scraper mechanisms; construction methods; rock-picking machine. (See also Reclamation Era v 28 n 8 Aug 1938 p 152-6)
Desilting works at imperial dam
Civ Eng (NY)
Forester, D.M. (Autor:in)
1938
4 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Desilting works at Imperial dam
Engineering Index Backfile | 1938
|Desilting works at Imperial dam
Engineering Index Backfile | 1938
|Desilting works at imperial dam
Engineering Index Backfile | 1938
|Imperial dam and desilting works on Colorado river
Engineering Index Backfile | 1938
Imperial dam and desilting works on Colorado river
Engineering Index Backfile | 1939