Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Reconstruction of Chelsea bridge
New £311,000 suspension bridge, featuring deeply founded solid piers, hinged towers without portals, self-anchored cables, unobstructed roadway, and no ornamentation; theory of self-anchored suspension bridge; use of high tensile steel in cables; demolition of old bridge; fabrication of steelwork. (See also - discussion n 8 430-46 supp plates and Oct (discussion) p 429-46)
Reconstruction of Chelsea bridge
New £311,000 suspension bridge, featuring deeply founded solid piers, hinged towers without portals, self-anchored cables, unobstructed roadway, and no ornamentation; theory of self-anchored suspension bridge; use of high tensile steel in cables; demolition of old bridge; fabrication of steelwork. (See also - discussion n 8 430-46 supp plates and Oct (discussion) p 429-46)
Reconstruction of Chelsea bridge
Instn Civ Engrs -- J
Buckton, E.J. (Autor:in) / Fereday, H.J. (Autor:in)
1938
47 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Reconstruction of Chelsea bridge
Engineering Index Backfile | 1938
|Reconstruction of Chelsea bridge, London
Engineering Index Backfile | 1937
Reconstruction of Chelsea bridge, London
Engineering Index Backfile | 1937
Engineering Index Backfile | 1936
Chelsea Street Bridge Replacement
British Library Conference Proceedings | 1998
|