Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Erection of balanced-cantilever bridge over Connecticut river
Bridge consists of two deck type plate girder approaches together with two 600-ft span, three-hinged tied arches over river, total length from west to east abutment being 3420 ft; description limited to system of erection adopted.
Erection of balanced-cantilever bridge over Connecticut river
Bridge consists of two deck type plate girder approaches together with two 600-ft span, three-hinged tied arches over river, total length from west to east abutment being 3420 ft; description limited to system of erection adopted.
Erection of balanced-cantilever bridge over Connecticut river
Engineering
Engineering ; 146
1938
4 pages
Supp plate
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Erection of balanced-cantilever bridge over Connecticut river
Engineering Index Backfile | 1938
Wind-induced effects during balanced cantilever bridge erection
British Library Conference Proceedings | 2002
|A novel method of bridge erection; Connecticut River bridge, northfield, Mass
Engineering Index Backfile | 1899
Balanced cantilever erection of twin tied arches
Engineering Index Backfile | 1938
|Considerations During Cantilever Erection of the Kamali River Bridge
British Library Conference Proceedings | 1995
|