Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
New international bridges, between Canada and United States
Two systems described; one consists of varied series of bridges crossing St. Lawrence at Thousand Islands; total cost estimated at £404,000; other is Blue Water International Bridge crossing St. Clair River, 1 1/4 mi in length, erected at cost of £400, 000; international portion consists of main span of 871 ft of arched cantilever form, and two anchor arms, each 326 ft. (see also Engineer v 166 n 4314 Sept 16 1938 p 315-6 and 310; Can Engr v 75 n 2 July 12 1938 p 6-9)
New international bridges, between Canada and United States
Two systems described; one consists of varied series of bridges crossing St. Lawrence at Thousand Islands; total cost estimated at £404,000; other is Blue Water International Bridge crossing St. Clair River, 1 1/4 mi in length, erected at cost of £400, 000; international portion consists of main span of 871 ft of arched cantilever form, and two anchor arms, each 326 ft. (see also Engineer v 166 n 4314 Sept 16 1938 p 315-6 and 310; Can Engr v 75 n 2 July 12 1938 p 6-9)
New international bridges, between Canada and United States
Engineering
Engineering ; 146
1938
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
New international bridges, between Canada and United States
Engineering Index Backfile | 1938
New international bridges, between Canada and United States
Engineering Index Backfile | 1938
New international bridges, between Canada and United States
Engineering Index Backfile | 1938
TECHNICAL PAPERS - Integral Abutment Bridges: Current Practice in United States and Canada
Online Contents | 2000
|