Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Maintenance and operating problems of Winnipeg
Data on maintenance of domestic water system which includes 328 mi of cast iron, cement asbestos, reinforced concrete and concrete covered steel pipes ranging in diam from 3 to 42 in., 2919 hydrants and 3361 main valves; 50,000 services made of lead, copper or cast iron; good design, regular inspections and records help to reduce damage.
Maintenance and operating problems of Winnipeg
Data on maintenance of domestic water system which includes 328 mi of cast iron, cement asbestos, reinforced concrete and concrete covered steel pipes ranging in diam from 3 to 42 in., 2919 hydrants and 3361 main valves; 50,000 services made of lead, copper or cast iron; good design, regular inspections and records help to reduce damage.
Maintenance and operating problems of Winnipeg
Am Water Works Assn -- J
Bubbis, N.S. (Autor:in)
1949
8 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Maintenance and Operating Problems of Winnipeg
Wiley | 1949
|Winnipeg. The Winnipeg town planning situation
Engineering Index Backfile | 1928
|Reflooring long Winnipeg bridge to save continual maintenance
Engineering Index Backfile | 1957
|Winnipeg Centennial Library, Winnipeg, Manitoba - Patkau Architects-LM Architectural Group.
Online Contents | 2004
Engineering Index Backfile | 1961
|