Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction of Lake City Sewer System in Pacific Northwest involves; activated sludge treatment plant in Washington, 8 mi of trunk sewers up to 48 in, in diam, about 200 mi of laterals from 80 in. to 36 in. in diam, 18,000 ft of interceptor sewers from 10 in. to 15 in. in diam, and 11 sunken concrete lift stations, each with two pumps ranging from 10 to 500 gpm; location of project shown in sketch map; total cost estimated $7,500,000.
Construction of Lake City Sewer System in Pacific Northwest involves; activated sludge treatment plant in Washington, 8 mi of trunk sewers up to 48 in, in diam, about 200 mi of laterals from 80 in. to 36 in. in diam, 18,000 ft of interceptor sewers from 10 in. to 15 in. in diam, and 11 sunken concrete lift stations, each with two pumps ranging from 10 to 500 gpm; location of project shown in sketch map; total cost estimated $7,500,000.
Nation's largest suburban sewer project
Pac Bldr Engr
Parker, I.C. (Autor:in)
1949
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Vanport City, nation's largest war housing project
Engineering Index Backfile | 1943
Nation's largest parking building completed
Engineering Index Backfile | 1952
Lockheed builds nation's largest cafeteria
Engineering Index Backfile | 1944
Largest sewer photo inspection
Engineering Index Backfile | 1965
|Opryland to become nation's seventh largest hotel
Online Contents | 1995