Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Tunnels and conveyors helped hot-mix contractor race with frost
How 1750 tons of asphaltic concrete was produced and placed per day on Illinois and Indiana resurfacing projects by aid of good plant equipment.
Tunnels and conveyors helped hot-mix contractor race with frost
How 1750 tons of asphaltic concrete was produced and placed per day on Illinois and Indiana resurfacing projects by aid of good plant equipment.
Tunnels and conveyors helped hot-mix contractor race with frost
Roads Streets
Roads and Streets ; 91
1948
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Frost aids contractor in gravel excavation
Engineering Index Backfile | 1929
Seven management factors helped this contractor avoid winter carry over
Engineering Index Backfile | 1950
Frost penetration in vehicle tunnels
British Library Conference Proceedings | 2003
|British Library Online Contents | 2009