Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
New 150-mgd. Intake at Cleveland, Ohio
Construction of reinforced concrete pipes each 24 ft long, 10 ft inside diam, wall thickness 10 in., and weight 50 tons; manufacture of reinforcement cages, setting form, concrete placing, and stripping form; pipes will form 18,500-ft lake section of new intake.
New 150-mgd. Intake at Cleveland, Ohio
Construction of reinforced concrete pipes each 24 ft long, 10 ft inside diam, wall thickness 10 in., and weight 50 tons; manufacture of reinforcement cages, setting form, concrete placing, and stripping form; pipes will form 18,500-ft lake section of new intake.
New 150-mgd. Intake at Cleveland, Ohio
Eng News-Rec
Engineering News-Record ; 141
1948
5 pages
Illustrations
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
The new waterworks intake tunnel for Cleveland, Ohio
Engineering Index Backfile | 1898
Engineering Index Backfile | 1888
|Baldwin Filtration Plant, Cleveland, Ohio
ASCE | 2021
|The walworth sewer, Cleveland, Ohio
Engineering Index Backfile | 1905
|Cleveland Harbor, Ohio. (Maintenance)
NTIS | 1972