Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Solving Savannah's drainage problem
Study of causes of flood in Savannah, Ga, revealed that box sewers were overloaded so that discharge was practically nil during flood; construction of 60 in. concrete pipe with runoff period of one hr was recognized solution; cost estimate $350,000.
Solving Savannah's drainage problem
Study of causes of flood in Savannah, Ga, revealed that box sewers were overloaded so that discharge was practically nil during flood; construction of 60 in. concrete pipe with runoff period of one hr was recognized solution; cost estimate $350,000.
Solving Savannah's drainage problem
Pub Works
Hankins, Jr., D.D. (Autor:in)
Public Works ; 80
1949
2 pages
Photographs
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Online Contents | 2011
|Savannah's sand-foundation streets
Engineering Index Backfile | 1948
British Library Online Contents | 2009