Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Claerwen Dam, Wales, of concrete gravity type with brick and masonry facework built in situ, 184 ft high from stream bed; foundation of 180 ft max width to be taken 10 to 15 ft into rock at downstream toe; excavation 160,000 cu yd, concrete 380,000 cu yd; 560,000 tons of rock to be crushed for concrete aggregate.
Claerwen Dam, Wales, of concrete gravity type with brick and masonry facework built in situ, 184 ft high from stream bed; foundation of 180 ft max width to be taken 10 to 15 ft into rock at downstream toe; excavation 160,000 cu yd, concrete 380,000 cu yd; 560,000 tons of rock to be crushed for concrete aggregate.
Building Britain's largest dam
Excavating Engr
Scott, P.A. (Autor:in)
Excavating Engineer ; 42
1948
3 pages
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
TIBKAT | 1988
|Engineering Index Backfile | 1936
Engineering Index Backfile | 1936
Britain's Youngest Listed Building
British Library Conference Proceedings | 1996
|Green Lanes: A report on Britain's largest road recycling project
British Library Online Contents | 1996