Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Clark Hill concrete dam is 2282 ft long and 200 ft high; lake impounded behind dam will cover 58,000 acres; earthfills at each end of dam will have max height of 150 ft and will constitute 3400 ft of total length of 5682 ft; site preparation, quarry development and ice plant.
Clark Hill concrete dam is 2282 ft long and 200 ft high; lake impounded behind dam will cover 58,000 acres; earthfills at each end of dam will have max height of 150 ft and will constitute 3400 ft of total length of 5682 ft; site preparation, quarry development and ice plant.
Rampart across Savannah
Excavating Engr
McCormack, C.H. (Autor:in)
Excavating Engineer ; 43
1949
Illustrations
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Online Contents | 1994
British Library Online Contents | 1994
British Library Online Contents | 2006
Continuity Testing of the Rampart and Homestake Pipelines
British Library Conference Proceedings | 2009
|