Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Longitudinal profile showing level differences from 153 m at Danube through maximum of 279 to 182 m at Glivice in Poland; total length of canal 322 km; 17 to 19 canal locks each 225 × 12 m required; estimated costs. From Gospodarka Wodna n 2 1947.
Longitudinal profile showing level differences from 153 m at Danube through maximum of 279 to 182 m at Glivice in Poland; total length of canal 322 km; 17 to 19 canal locks each 225 × 12 m required; estimated costs. From Gospodarka Wodna n 2 1947.
Oder-Danube canal project
Le projet de canal Oder-Danube
Driewouski, Z. (Autor:in)
1948
5 pages
Aufsatz (Zeitschrift)
Französisch
© Metadata Copyright Elsevier B. V. All rights reserved.
The Danube-Moldau canal project
Engineering Index Backfile | 1902
Engineering Index Backfile | 1938
Engineering Index Backfile | 1923
|Engineering Index Backfile | 1939
|Engineering Index Backfile | 1938