Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Reconstruction of steel arch bridge of Argenteuil, France
With one span of 61 m and two spans of 66.40 m; bridge carries 12 m road and two sidewalks; slab of reinforced concrete 21 cm thick; abutments and piers of concrete, founded by means of caisson; superstructure; original clearance of 6 m was increased during construction to 7 m; this necessitated lifting of arch already placed.
Reconstruction of steel arch bridge of Argenteuil, France
With one span of 61 m and two spans of 66.40 m; bridge carries 12 m road and two sidewalks; slab of reinforced concrete 21 cm thick; abutments and piers of concrete, founded by means of caisson; superstructure; original clearance of 6 m was increased during construction to 7 m; this necessitated lifting of arch already placed.
Reconstruction of steel arch bridge of Argenteuil, France
La reconstruction du pont d'Argenteuil
Maurin, G. (Autor:in)
1949
15 pages
Diagrams, Sectional drawings, Photographs
Aufsatz (Zeitschrift)
Französisch
© Metadata Copyright Elsevier B. V. All rights reserved.
The foundations of the 2^n^d railway bridge of Argenteuil
British Library Conference Proceedings | 2005
|Emmanuel Combarel et Dominique Marrec - résidence d'étudiants à Argenteuil.
Online Contents | 2003
Reconstruction of a bound-concrete arch of railway bridge in France
Engineering Index Backfile | 1920