Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
New D.C. bridge abutment settles
Abutment of plate girder bridge in Washington, DC, has settled 1.14 ft below original design grade; contract changed to provide for underpinning, which will be done at six locations on each sidewall of abutment; correction of condition will cost $150,000 and delay completion 90 days.
New D.C. bridge abutment settles
Abutment of plate girder bridge in Washington, DC, has settled 1.14 ft below original design grade; contract changed to provide for underpinning, which will be done at six locations on each sidewall of abutment; correction of condition will cost $150,000 and delay completion 90 days.
New D.C. bridge abutment settles
Eng News-Rec
Engineering News-Record ; 143
1949
Aufsatz (Zeitschrift)
Englisch
© Metadata Copyright Elsevier B. V. All rights reserved.
Bridge abutment and bridge abutment design and construction method
Europäisches Patentamt | 2021
|